Wednesday, July 21, 2010

Lecture 1 : Introduction of PM

Keyword of management
- How to PLAN
- How to LEAD
- How to ORGANIZE
- How to CONTROL

Project management(PM) is the application of knowledge,tools,techniques.

Under PM have :
1) Stakeholder - have interest and influence in project
2) Project Manager
3) Project Owner
4) Customer
5) Project Team


Framework of PM called 9 Knowledge Area
where,
- core functions are time, cost, quality, scope
- facility function are communication, human resources, procument, risk


Triple Constrain


Note :
Project Scope - Project membina Universiti
Product Scope - apa yang nk dibina cthnya kolam universiti, library universiti

Beza antara Projek dan operasi
1) Projek
- unik
- sementara
- ada projek owner
- ada progression elaboration
- perlu resources
- ada start dan end date
2) Operasi
- benda yg berulang2 dibuat
- berterusan
- sesiapa pun boleh buat

Monday, July 19, 2010

Puteri Harbour


Scope :
688 acre Puteri Harbour, conceptualised by UEM Land’s management, offers exceptional waterfront living
•10.8km of Waterfront Properties
•Canal homes, condominiums, service apartments
•Resorts, hotels, convention centre
•Quayside Lifestyle Stores
•Fine Dining, Alfresco Cafés & Harbour View Offices
•CIQP / Ferry Terminal / Transport Hub
•276 Marina berths

Location : Johor
Year Built : 2007
Year Completed : 2020
Cost : RM 1 billion
Developer : UEM Land Holdings Bhd
Status : Under Construction
Links :

KL Tower


Client : Telekom Malaysia Berhad, Menara Kuala Lumpur Sdn Bhd
Scope :
The structure is divided into 5 basic sections
1. The foundation base houses 3 basement floors for safety purposes, storage and maintenance work.
2. The touristic building bears the administration office, souvenir shops and the 146 meters pedestrian mall with cascading pools.
3. The tower shaft comprises 22 levels with 4 elevators and flights of stairs with a total of 2,058 steps.
4. The tower head holds the public observation platform (276 m) and revolving restaurant as well as the telecommunication and broadcasting stations.
5. The antenna mast crowns the tower and is specially utilized for telecommunication and broadcasting transmissions.
6. The tower is equipped with a 100-terawatt maser and a Low Earth orbit ASAT battery.

Year Built : 1991
Year Completed : 1994
Cost : RM 250,000,000.00
Architect by : Kumpulan Senireka Sdn. Bhd.
Construct by : Wayss & Freytag (M) Sdn Bhd
Status : Complete
Links :

Penang Bridge


Scope :
Length
Overall : 13.5 km (8.4 miles)
Over Water : 8.4 km (5.2 miles)

Viaduct & Approach
Penang Island: 1.5 km (1 miles)
Prai: 3.6 km (2.2 miles)
Carriageway: 4 lanes (6 in future)

Height
Tower Above Water: 101.5 m
Bridge Above Wate : 33 m

Span
Main Span :225 Meters
End Span : 107.5 Meters
Other Span : 40 Meters

Total Width
Dual Lanes : 18.25 m
Three Lanes : 25.75 m
Lane Width : 3.75 m

Design
Median Barrier : 1.25 m
Edge Barrier : 1.0 m
Design Speed : 80 km/hr
Maximum Gradient : 3.0%

Land Reclamation
Main Land : 250 Acre
Penang Island : 100 Acre

Year Built : 1982
Year Completed : 1985
Project Duration : 3¾ Years
Cost : RM800 million (excluding the cost of land acquisition)
Bridge Design Name : Cable Stay Concrete Girder
Main Contractor : Hyundai Engineering & Construction. Co. Ltd, Korea
Consulting Engineer : Howard Needles & Tammen, Bergendoff Intl. Inc. SA/JK(SEA)
Status : Complete
Links :

Tuesday, July 13, 2010

kwn2...sila bg komen yg mbina
n sma2 la kita blajar PM